Work zone signs

Utility Work Ahead sign

Crews are repairing or installing power, gas, water, or cable lines on or beside the road. Expect parked utility trucks, open trenches, or a flagger.

  • Diamond
  • Orange
  • MUTCD W21-7
Utility Work Ahead sign
How to recognize it

Shape and background first

ShapeDiamonda diamond stood on its point
BackgroundOrangeorange, used only for temporary work zones
FamilyWork zone signsFederal designation W21-7 in the MUTCD.

Federal designation W21-7 in the MUTCD, the national standard every state signs to. Frequently posted on ordinary residential and arterial streets rather than highways, since utility lines run under nearly every road.

What the MUTCD specifies

Designation: W21-7

MUTCD Section 6H.24

Conventional road size: 36 x 36 in

Source: Federal Highway Administration, MUTCD 11th Edition (December 2023), Part 6, Table 6H-1, verified 2026-09-26.

On the test

What the test wants you to know

The mistake people make

Unlike a paving job, utility work rarely has a tidy cone taper, so the hazard can appear with almost no notice, a bucket truck half in the lane or a worker stepping out from behind a van. Treat the reduced attention this sign gets as the actual trap the question is testing.